⁄⁄ Pricing
Domestic EPC
|
Solar EPC * | On Construction EPC ** |
EPC Recovery
|
SAP Calculations *** | U-value calculations
|
Public buildings **** | Commercial EPC
| |||||||
No. Beds |
£ |
No. Beds |
£ |
Information presented |
£ |
Volume |
£ |
Type |
£ |
Element |
£ |
Type |
£ |
From £ |
1-2 |
40 |
1-2 |
50 |
Full |
45 |
1-49 |
5.99 |
Standard |
125 |
Wall |
30 |
Advisory Report |
99 |
225 |
3-5 |
50 |
3-5 |
65 |
Partial |
95 |
50-99 |
3.99 |
Dormer |
225 |
Plane roof |
30 |
Display Energy Certificate |
99 |
|
6-8 |
75 |
6-8 |
85 |
|
100+ |
1.99 |
Extension |
175 |
Floor |
30 |
Site inspection |
185 |
| |
9+ |
125 |
9+ |
135 |
|
|
Conversion |
175 |
Dormer |
45 |
|
| |||
**Full information to include SAP calculation, documentary evidence for new dwellings should include photograph. ***From plan; if development is already under construction an additional fee of £100.00 is payable. ****DECs renewed annually; Advisory reports renewed every 7 years; site inspections are based on our day rate per surveyor Multiple dwellings fee by negotiation. |